
This product is easy to underestimate, but the manufacturing behind it isn't.
A distribution partner isn't just picking up a good mat. You're plugging into a network with decades of relationships and a disciplined build process. That's what decides whether shelf space turns into reliable supply.
Two people, one production relationship.
88 Oceans International, with its manufacturing partner Carson Group, headed by Kevin Teng, leads production. Kevin manages the offices in China, Taiwan, and Malaysia, which oversee every manufacturing specification, production plan, round of testing, and production run. Paul Tittmann heads that side of the relationship, having worked across Asia from 1975 to 2011 in retail buying, manufacturing, and distribution roles, plus years running multinational joint ventures and his own consulting business.
Gary Kiser runs the US side: sales, offshore project management, and engineering and design for US manufacturers. Their role runs through FOB delivery, meaning the product is made, tested, and loaded before the partner's logistics take it from there.
A relationship measured in decades, not months.
Clear Step is built by Carson Group and its affiliates, a contract manufacturer with origins in 1960s Taiwan. The network now operates across Taiwan, China, Malaysia, and North America, with decades of medical and consumer device production behind it. Paul Tittmann's relationship with the family that owns the network predates Clear Step by many years.
That history matters. Factories prioritize the customers they already know, and a new brand with no track record can end up at the back of the line. Clear Step isn't a cold introduction: it moves through a relationship that already carries decades of trust.
A build process with a gate at every stage.
Clear Step followed a disciplined path from concept to production-ready product, about four years start to finish.
Design for manufacturing
A product engineering firm in Austin, Texas, turned the working prototype into a production-ready specification, working out tolerances, jigs, tooling, and manufacturability before cutting tooling.
Engineering build
The design moved onto production tooling for a full engineering build, proving the specification works on real equipment.
Pilot run and quality sign-off
A pilot run went to 44 American households, who lived with the mat for a month and shaped the final design. Quality sign-off, including packaging drop tests, closes the stage.
Mass production
The full manufacturing build runs on the production tooling proven in the earlier stages. Clear Step has cleared the engineering build and is now entering this stage.

A supply chain built to adapt.
Sanitization sheets are produced in China. Mat base production, packaging, final assembly, and testing happen at Carson Group's offices in Malaysia. That split lets each piece of the process run where it's produced best.
That wasn't the starting point: it was a deliberate change. When US tariffs made a China-only finished product uneconomic, the team restructured sourcing instead of cutting corners. Vietnam and domestic US options were evaluated too, before Malaysia was chosen. That willingness to rebuild around new conditions is itself a signal: this isn't a one-country operation.
Delivery on your terms, not just one path.
Partners aren't locked into one way of receiving Clear Step. Product can move through your own import and logistics, or through an established US import and distribution relationship already in place. Packaging is built for retail shelf and adaptable to your channel.
Let's talk about what it takes to bring Clear Step to your shelves.
If you're evaluating Clear Step for distribution, we're ready to walk through the manufacturing side in detail.
Inquiries: Roberto Lopesino Seidita, RG Syndicate, roberto@rgsyndicate.com.
See the consumer story at /clearstep.